Sundt’s Industrial Virtual Design and Construction (VDC) team is working together to coordinate construction models and the skilled trades who use them, with the goal of making each facility on the 30+ building campus as constructible, high-quality and cost-effective as possible.
Source: https://www.sundt.com/2021/09/07/industrial-vdc-puts-in-team-effort-to-solve-treatment-plants-most-technical-challenges/